Cabinet swaps, backsplash, counters, lighting and layout changes, from a refresh to a full tear-out.

A kitchen remodel can be a weekend of new hardware and a backsplash or a full tear-out with a new layout. Most are somewhere in between. The first thing we do is figure out which one you actually want, because the price and the disruption are very different.
Demolition and disposal, framing changes, electrical and plumbing rough-in, drywall, cabinet installation, counter templating and coordination, tile, flooring, trim and paint. We write all of it into one estimate so there is one number and one crew.
A full kitchen is weeks without a kitchen. We schedule the stages so the time without a working sink and stove is as short as the job allows, set up a temporary spot for the fridge and microwave, and tell you up front which days will be loud.
Tell us what needs doing. We will set up a time to come look at it, and you will have a written scope and price before anyone picks up a tool.
Call or text (815) 585-1750
Email matt@onitcc.com