New Lenox, Will County

Kitchen Remodeling in New Lenox

Finish your New Lenox kitchen with a floor that runs clean under the new layout, laid by the same crew that sets the cabinets.

New Lenox kitchens, floors included

The floor gets decided early in every kitchen job, because it affects how the cabinets go in. In a refresh the floor usually stays, so we protect it and work around it. When cabinets are replaced in the same layout, we check whether the new boxes cover the old footprint or leave a strip of bare subfloor. In a layout change, the floor comes up with the walls and old cabinets, and a new one goes down across the whole room.

We cover New Lenox every week, coming in on I-80, Route 30, Cedar Road and Laraway Road near the Old Plank Road Trail. Whatever the house, a kitchen floor has to sit on a flat, solid subfloor, and pulling old cabinets is when you find out what that subfloor looks like. We check for soft spots near the sink and dishwasher, flatten the low spots and repair what needs it before the new floor goes down. Some floors go under the cabinets and some stop at them, and we explain which and why at the estimate.

Kitchen Remodeling by ONIT Solutions

What a New Lenox kitchen estimate covers

Old floor removal

Tile, vinyl or wood comes up along with the cabinets, and the debris goes with us.

Subfloor repair

Soft spots near water get cut out and replaced, and low areas get leveled for the new floor.

Framing and rough-in

Walls get opened or built, and plumbing and electrical get moved for the new plan.

Cabinets and counters

We install cabinets you bought or ones we order and coordinate the counter template and set.

New flooring

Plank, tile or engineered wood goes down with transitions into the rooms next door.

Backsplash, trim and paint

Tile on the wall, new base and casing, and fresh paint on walls and ceiling.

How a New Lenox kitchen remodel runs

The estimate starts with a visit where we measure, look at the floor and check the walls you want changed. You get every phase in writing, from demo to the last coat of paint, and you approve it before we schedule. Subfloor damage we can only see after the cabinets come out gets priced in writing and waits for your go-ahead. We book around the days we said, flag the loud ones, and walk the finished floor and cabinets with you.

  • Floor decision made before cabinets are ordered
  • Subfloor checked once the old cabinets are out
  • Transitions into the next rooms included
  • Permits through the village where required
  • Days without a sink kept as few as the job allows
  • Walkthrough of the finished kitchen
FAQ

Kitchen Remodeling in New Lenox: questions

Should the new floor go under the cabinets?
It depends on the floor. Some tile goes under, while floating plank floors usually stop at the cabinets with the toe kick covering the edge. We pick the method that suits your material and explain it in the estimate.
Do I need a permit for a kitchen remodel in New Lenox?
When plumbing, electrical or structural work requires a permit from the village of New Lenox, we pull it and schedule the inspections.
How long does a New Lenox kitchen take?
A refresh is a few days. New cabinets in the same layout usually take two to three weeks, with the counter lead time added after templating. A layout change with a new floor takes longer, and we put that schedule in writing.
Do you remodel kitchens around New Lenox?
Yes. Mokena, Frankfort, Lockport and Homer Glen are all on our route.
How do I get started?
Call or text (815) 585-1750 for a free on-site estimate.

More questions and answers ›

Also in New Lenox

Other work we do in New Lenox

Nearby

Kitchen Remodeling in nearby towns

Free estimate

Start your New Lenox kitchen from the floor up

Call or text (815) 585-1750 to set up a visit. We will check the floor and walls and write the full job out.

Call or text (815) 585-1750
Email matt@onitcc.com

Or call or text (815) 585-1750. We reply during business hours.

Call (815) 585-1750Get an Estimate