Frankfort, Will County

Kitchen Remodeling in Frankfort

Know which days your Frankfort kitchen remodel will be loud before they come, with dust kept to the kitchen and the rest of the house left clean.

A Frankfort kitchen remodel you can live around

Some days of a kitchen remodel are loud, and we tell you which ones before they start. Demo, tile cutting and drilling for cabinets make noise, while drywall finishing, paint and hookups mostly do not. Dust stays in the kitchen behind plastic at the doorways, with the floors along the path covered. The scope can be a refresh, new cabinets in the same layout, or a layout change with walls opened and an island added, and one estimate covers the full job.

We work in Frankfort every week, coming in on Route 30, Route 45, LaGrange Road and I-80 near the Old Plank Road Trail. If you work from home or have kids napping, give us the hours that matter and we will build the loud days around them where the job allows. We also set up a temporary spot for the fridge and microwave away from the work area, so nobody walks through the dust to get to them. The schedule goes in writing with the loud days marked, and we book around the days we said.

Kitchen Remodeling by ONIT Solutions

What is included in a Frankfort kitchen job

Dust walls at the doorways

Plastic barriers and covered walkways keep the rest of the house clean while the kitchen is torn out.

Demo and disposal

Old cabinets, counters and flooring go out the shortest path to our trailer.

Walls and rough-in

Bearing walls are checked before they open, and plumbing and electrical move to the new plan.

Cabinets your way

We install cabinets you supply or source them for you.

Counters and backsplash

We coordinate the counter template and set, then tile the backsplash.

Floor, trim and cleanup

New flooring, trim and paint go in, then a cleanup that leaves the room cleaner than we found it.

How a Frankfort kitchen remodel runs

We come out for a free estimate, measure, and ask how your household uses the house during the day. The written estimate covers each trade, and the schedule marks the loud days and the days without a sink and stove. You approve both before we order anything. If something hidden changes the work, we put the price in writing and wait for your approval, and the job ends with a walkthrough.

  • Loud days named in the written schedule
  • Dust kept behind plastic at the doorways
  • Walkways and floors covered
  • Fridge and microwave moved out of the work zone
  • Changes approved in writing first
  • Room left cleaner than we found it
FAQ

Kitchen Remodeling in Frankfort: questions

Can you schedule the loud work around my workday?
Where the job allows, yes. Tell us the hours that matter at the estimate, and we will mark the loud days on the written schedule.
Do I need a permit for a kitchen remodel in Frankfort?
When plumbing, electrical or structural changes require a permit from the village of Frankfort, we pull it and schedule the inspections.
How long does a Frankfort kitchen remodel take?
A refresh takes a few days. New cabinets in the same layout usually take two to three weeks, plus lead time on the counters after templating.
Do you work in towns near Frankfort?
Yes. We also remodel kitchens in Mokena, New Lenox and Orland Park.
How do I get an estimate?
Call or text (815) 585-1750 to set up a free on-site visit.

More questions and answers ›

Also in Frankfort

Other work we do in Frankfort

Nearby

Kitchen Remodeling in nearby towns

Free estimate

Talk to us about your Frankfort kitchen

Call or text (815) 585-1750. We will measure, ask about your daily schedule and write the job up with the loud days marked.

Call or text (815) 585-1750
Email matt@onitcc.com

Or call or text (815) 585-1750. We reply during business hours.

Call (815) 585-1750Get an Estimate