Tub to shower conversions, vanities, tile and fixtures, with the plumbing and electrical handled in the same job.

Bathrooms are the most involved room per square foot in the house: plumbing, electrical, tile, ventilation and waterproofing all in a few square feet. It is also the room where a shortcut shows up fastest, usually as a leak you find out about from the ceiling below.
Tile is not waterproof. The layer behind it is, and that layer is what we spend the time on. Showers get a continuous waterproofing membrane, sloped correctly to the drain, tested before the tile goes on.
Often a one-week job: new vanity, toilet, floor, lighting, paint. A good first project if you want to see how we work before taking on the master bath.
Tell us what needs doing. We will set up a time to come look at it, and you will have a written scope and price before anyone picks up a tool.
Call or text (815) 585-1750
Email matt@onitcc.com