Get a Warrenville bathroom that clears its steam, keeps water out of the walls and is finished by a crew that does the plumbing, wiring and tile together.
Water is the reason bathrooms fail, so we build every one of ours around keeping it where it belongs. The shower gets a membrane that runs unbroken across the walls and floor, the pan is sloped to the drain, and we fill it and let it sit before any tile is set. The exhaust fan gets ducted through the roof or an outside wall. Around that we install the vanity, counter, faucet, toilet, lighting, trim and paint, so you deal with one crew from demolition to the last coat.
We cover Warrenville off I-88 and Route 59, with Butterfield Road and Winfield Road taking us across town. It is a DuPage County city along the West Branch of the DuPage River, with wooded lots in parts of town. Where a house sits in heavy shade, the bathroom gets less help drying out between showers, so the fan has to do that work. We trace where your current fan actually goes, and if it ends in the attic, the remodel fixes that.

Floor runners, a zip wall at the bathroom door and covered returns keep dust out of the rest of the house while the old room comes out.
The shower floor is sloped toward the drain, waterproofed, then filled with water and left to sit so we know it holds before tile goes down.
A fan sized for the room is ducted through the roof or an outside wall with a damper, never left blowing into the attic.
If the tub only gets used as a shower, we take it out and build a walk-in shower in its place, with the drain moved to suit.
The new vanity and top are set level, the sink and faucet are connected and the shutoffs under it are replaced.
Moisture-resistant board goes up outside the shower, then trim and paint, so the room is finished when we leave instead of handed to another trade.
It starts with a free visit where we measure, look at the fan, the drain and the floor, and talk through what you want. You get a written estimate that lists the work in order and the fixtures it includes. Anything we find behind the walls that changes the job gets priced in writing and waits for your okay. When your tile and fixtures arrive we set the start date and keep to it, and the last step is a walkthrough with water running at every fixture.
Text (815) 585-1750 a photo of the bathroom as it is now, and we will set up a time to come measure.
Call or text (815) 585-1750
Email matt@onitcc.com