Siding, trim, soffit, fascia, doors and porches, washed, scraped and primed first, with rotted wood replaced instead of painted over.

An exterior paint job fails from the bottom up: bare wood that was never primed, caulk that has opened, rot that got painted over. We spend the time on those before any color goes on, because that is what makes the next repaint years away instead of two summers.
Exterior work runs spring through fall, on dry days warm enough for the product to cure. We schedule around the forecast and tell you when a day moves.
Tell us what needs doing. We will set up a time to come look at it, and you will have a written scope and price before anyone picks up a tool.
Call or text (815) 585-1750
Email matt@onitcc.com