Bolingbrook, Will County

Floor Coatings in Bolingbrook

Park on a Bolingbrook garage floor that does not lift under hot tires or stain from what drips off the car.

Polyaspartic garage floors for Bolingbrook drivers

A polyaspartic flake floor is what we put down when a garage has to carry a car every day. Our MK Concrete Coatings crew diamond grinds the concrete, never acid etching it, and fills the cracks and pits before anything else. Then comes an epoxy base that acts as a moisture vapor barrier, loaded with flake until it will not take another chip. The polyaspartic top coat over it is the part that handles hot tires, road salt and UV.

We cover Bolingbrook off I-55 and Route 53, and through town on Boughton Road, Weber Road and Veterans Parkway. After a summer highway drive, tires come into the garage hot, and on a weak coating that heat softens the surface enough for the tire to pull it off the floor. That is called hot tire pickup, and it is one of the main ways cheap garage coatings fail. If your Bolingbrook garage has peeling spots right where the tires sit, that is usually what happened.

Floor Coatings by ONIT Solutions

What goes into a Bolingbrook garage floor

Old coating removal

Peeling paint or a failed coating gets ground off down to sound concrete.

Diamond grind, no acid

Grinding gives the base a clean surface to bond to. Acid etching can leave residue and an uneven surface, so we do not use it.

Cracks and pits filled

Repairs go in before the base and get ground smooth with the rest of the floor.

Epoxy base with vapor barrier

Moisture coming up through the slab is stopped under the flake instead of pushing the coating up.

Flake to full coverage

Chips are broadcast into the wet base until it is completely covered, then scraped once cured.

Top coat for hot tires

Polyaspartic resists the heat and grip of tires that come in off the highway, plus salt and UV.

How we handle a Bolingbrook coating

We start with a free visit to measure and look the slab over, and we bring cured flake samples so you can see the color in daylight. The estimate comes in writing at $8.50 per square foot, with a $2,000 minimum. If we find an old coating that has to come off, or damage under it, we price that in writing and wait for your yes. We book the days with you, and at the end we walk the floor together and go over when the car can come back in.

  • Free visit with cured flake samples
  • Failed coatings ground off, not covered
  • Cracks filled and ground flush
  • Base that blocks moisture from the slab
  • Top coat that resists hot tire pickup
  • Car back in after 72 hours

See floor colors and pricing at MK Concrete Coatings

FAQ

Floor Coatings in Bolingbrook: questions

What is hot tire pickup?
It is when hot tires soften a weak coating and pull it off the floor as the car backs out. A polyaspartic top coat over a properly bonded base resists it, which is why we use it.
My last garage coating peeled. Can you fix it?
Yes. We grind the old coating off down to sound concrete and start the system fresh. We do not coat over a coating that is already letting go.
Do I need a permit in Bolingbrook for this?
A coating on an existing garage slab usually does not. If the village of Bolingbrook requires a permit for any part of your job, we pull it.
How long until I can park in the garage?
Foot traffic is fine after 24 hours and vehicles after 72. Call or text (815) 585-1750 and we will put the install days on your estimate.
Which towns near Bolingbrook do you cover?
We also coat floors in Romeoville, Woodridge, Darien and Lemont.

More questions and answers ›

Also in Bolingbrook

Other work we do in Bolingbrook

Nearby

Floor Coatings in nearby towns

Free estimate

Price a Bolingbrook garage floor

If tires are already pulling up your old coating, call or text (815) 585-1750 and we will come see what the floor needs.

Call or text (815) 585-1750
Email matt@onitcc.com

Or call or text (815) 585-1750. We reply during business hours.

Call (815) 585-1750Get an Estimate