When a wall comes out of your Darien home, the ceiling where it stood should look like it was never there. We finish the new board on walls and ceilings so the remodel reads as one room.
Ceilings are the hardest drywall to finish, because light from windows and fixtures runs along them and shows every ridge. We tape ceiling joints in paper, keep the coats thin and feather them wide, and sand overhead with vacuum sanders where they fit so the dust does not settle on everything below. Walls get the same three-coat process with bead on every outside corner. Everything is primed once the finish coat is sanded.
We cover Darien, reached off I-55 and along Route 83, 75th Street and Cass Avenue in DuPage County. When a kitchen gets opened to the family room, the wall that came out leaves a strip of open ceiling where its top plate used to be. We fill that strip with new board, shim it flush to the old ceiling, and feather the joints out on both sides so no line shows when the room is painted. If your Darien ceiling has texture, we match it over the new piece instead of leaving a flat stripe through the room.

New board fitted, shimmed flush and finished into the existing ceiling.
Ceiling seams taped in paper and coated in thin, wide passes so they stay flat.
Fresh walls from the remodel taped, beaded and finished to paint.
Textured ceilings matched over the new board so the repair does not read as a stripe.
Vacuum sanding where it fits, with the floor and anything left in the room covered.
Walls and ceiling primed so the finish coat of paint goes on even.
We walk the remodel with you, look at the board or the framing, and leave a free written estimate that covers the walls and the ceiling. An opened ceiling sometimes shows a sagging joist or old wiring that needs attention, and when it does we stop, write up the change with a price and wait for your okay. Coats dry between visits, so we book around the days we said and tell you which rooms are off-limits each day. A final walkthrough under the room's own lights closes it out.
Call or text (815) 585-1750 when the framing is done. We will look at the walls and ceiling and put the finish in writing.
Call or text (815) 585-1750
Email matt@onitcc.com