24/7, call or text (815) 585-1750. When mold shows up behind tile or drywall in your Schaumburg home, we take it out behind containment, fix the reason it grew, and rebuild the wall properly.
Order matters on a mold job. Containment goes up first, plastic sheeting with a zipper door, and a negative air machine draws air into the work area so dust does not drift into the rest of the house. HEPA air scrubbers then run through every step that follows. The affected tile, backer, drywall and insulation come out and get bagged in place, and the studs and hard surfaces are HEPA vacuumed, cleaned and treated with an antimicrobial. Fixing the water and rebuilding come last, never first.
Schaumburg is on our regular route, reached on I-90, I-290 and Route 53, and we work across town from Golf Road to Meacham Road on both the Cook and DuPage sides. If the grout in your Schaumburg shower keeps going dark or a tile sounds hollow when you tap it, water may be getting behind the tile and into the wall. A shower built without a real waterproofing membrane behind the tile lets that happen slowly. We tear out the affected wall, remediate the cavity, and rebuild the shower with a proper membrane so the wall stays dry behind the tile.

Containment closes the bathroom off from the hall and bedroom while we tear out.
A negative air machine moves air into the work area, and HEPA scrubbers clean it.
Tile, backer board, drywall and insulation the water and mold reached, removed and bagged.
Studs, plates and subfloor HEPA vacuumed, cleaned and treated with an antimicrobial.
New backer, a real waterproofing membrane and tile, with the fan vented outside.
We recommend an independent tester confirm the area before the new wall goes up.
We give you a free estimate in writing, with remediation and the bathroom rebuild listed as separate parts and equipment daily rates spelled out. If the subfloor or framing turns out worse once the tile is off, we write up that repair and get your approval before doing it. Tile and fixtures get picked before the rebuild starts, so the schedule holds once it begins. A walkthrough of the finished bathroom closes out the job.
Send a photo to (815) 585-1750, day or night, and we will tell you whether it looks like it is behind the wall.
Call or text (815) 585-1750
Email matt@onitcc.com