Aurora, Kane, DuPage, Will and Kendall counties

Drywall Taping & Finishing in Aurora

Drywall joints in your Aurora home finished with the right tape and compound for each seam, so they cure hard and paint out flat. We pick the materials joint by joint and finish in three coats.

Paper tape, mesh tape and the right compound in Aurora

Not every joint gets the same tape. Paper tape is stronger in inside corners and on most flat seams, and mesh tape works on some flat joints when it is bedded in setting compound, which cures harder than premixed mud. We choose for each seam rather than using one product everywhere. After the tape coat, we build the joint with fill and finish coats, sanding between each so the last coat goes on smooth.

Aurora is on our regular route, and we reach it on I-88, Route 59, Orchard Road, Eola Road and Farnsworth Avenue, on both sides of the Fox River. The city spreads across Kane, DuPage, Will and Kendall counties, and the work we finish here ranges from a new basement to a remodeled room in an older house. If your Aurora house is older and the framing has settled, new board set against it can see more movement at the joints, which is where paper tape and a setting-compound first coat matter most. We look at the framing at the estimate and choose the materials from there.

Drywall Taping & Finishing by ONIT Solutions

What finishing includes in Aurora

Paper tape on corners

Folded paper tape on every inside corner, where mesh tends to crack.

Setting compound first coat

A hard-curing first coat on joints that need extra strength.

Mesh where it fits

Mesh tape only where it belongs, always bedded in setting compound.

Lighter top coats

A lightweight compound on the finish coats that sands to a smooth face.

Fastener spotting

Every screw head coated three times.

Sanded between coats

Each coat sanded before the next so ridges do not build up.

How an Aurora finishing job runs

We look at the framing and board in person and write a free estimate that lists the tape, the compound, the finish level and the visits. If something turns up once we start, like a bowed stud pushing a seam out, we stop, price the fix in writing and wait for your go-ahead. Setting compound changes the drying schedule, and we tell you which days we come back. When the last coat is sanded, we check every joint with you before primer.

  • Free written estimate naming the materials
  • Paper tape in every inside corner
  • Setting compound where strength matters
  • Three coats with sanding between
  • Floors covered and dust held in the room
  • Joint-by-joint check before primer
FAQ

Drywall Taping & Finishing in Aurora: questions

Is mesh tape or paper tape better?
Paper is better for corners and most seams. Mesh works on some flat joints when it is set in hard-curing compound. We use each where it belongs.
Do I need a permit for drywall work in Aurora?
Finishing by itself usually does not need one. If new walls, wiring or a basement finish are part of the job, we check with the City of Aurora and pull what it requires.
How long does it take?
With setting compound on the first coat, some rooms move along faster between coats. Most still take several visits, and the estimate lists them.
Which towns near Aurora do you cover?
Montgomery, Oswego, Warrenville and Naperville. Call or text (815) 585-1750 from any of them.
Can you finish board in an older house where the framing has moved?
Yes. We check the framing first, and if a stud needs work before taping, we price it in writing so you decide.

More questions and answers ›

Also in Aurora

Other work we do in Aurora

Nearby

Drywall Taping & Finishing in nearby towns

Free estimate

Get Aurora drywall finished with the right materials

Call or text (815) 585-1750 and send a photo of the board. We come out and write up the materials and the plan.

Call or text (815) 585-1750
Email matt@onitcc.com

Or call or text (815) 585-1750. We reply during business hours.

Call (815) 585-1750Get an Estimate